The City of Muscatine is seeking to remove the playground equipment and at least 16 clothes line poles at Sunset Park.
Scope of Services to be Performed
The Contractor shall provide all labor, materials and equipment to perform the work described below at the site.
Sunset Park
2806 Bloomington Lane
Muscatine, IA 52761
- Remove all existing playground equipment, timbers, mulch, and rock from the four play areas, except the pieces described below:
- The benches and picnic tables will remain in place.
- Remove all (at least 16) clothesline poles
- Dig up and remove all associated concrete footings of removed equipment and poles.
- Backfill all holes left by the concrete footings with topsoil; tamp down and smooth.
- All demolished/removed material will need to be removed from the property.
Responses are due by 12:00 p.m. Thursday, June 30, 2022. Responses may be mailed or emailed to:
City Hall
Attn: Rob Awbrey 215 Sycamore Street
Muscatine, IA 52761
Email: r
If you have any questions, please contact Rob Awbrey at 563-272-9317.
REQUEST FOR PROPOSAL (PDF)